Spoil management may be required due to a number of factors including client preference, environmental permit restrictions, process control, vessel draft requirements, socket infill risk and localised atheistic purposes.
LDD is able to provide a number of different options subject to your individual site requirements. This can be from a simple redirection of the spoil discharge line to complete closed loop spoil management systems where drill cuttings are captured and removed from the drilling process.
Please refer to our Spoil Management Systems datasheet.
Spoil Management Options:
• Directional discharge
• De-airing system
• Silt / turbidity curtain
• Weir settlement system— barge
• Weir settlement system—container
• De-sanding cyclone systems
• Settling ponds
• Adjacent pile filling
• Turbidity monitoring
Please contact us for further information.
Read more on the following equipment that we have available for your next pile installation campaign.
Read more about the industries where we are providing pile installation services...
Browse the following projects where we have provided pile installation services, ranging from complete integrated packages to discrete equipment rental.